LAKESIDE PRESBYTERIAN CHURCH – With the build-out of the second floor of their education building, and the addition of an elevator, this 8,000 sq. ft. remodel will be a welcome addition to their ministry in the Southlake area. We should have everything ready for them in early December 2021.
