Bailey Ranch Industrial Building

Bailey Ranch Industrial Building

LEAN Construction Design and Build

Start Date: 1.1.19

End Date: 8.15.19

Approx. Budget: 2.5 Million

Location: Aledo, Texas

Spec: This is a 28,000SqFt shell building. It is constructed of concrete tilt wall panels. The building is designed for up to 8 tenants at any one time.

Scroll to Top